I'm trying to create my first drill report with Report Builder 3.0. I have created a summary report with 2 parameters: (1) Team and (2) Type. When this report runs, it displays summary information by branch.
I've created a second report (the drill report) that I would like to run when the user clicks on the branch. The second report shows the detail for the branch. I have 3 parameters in this report: (1) Team, (2) Type and (3) Branch.
The Team and Type parameters (on the drill report) should use the same values from the main report. The Branch parameter should be the Branch the user clicks. I have added a hyperlink to the Branch field on the main report.
In the Text Box Properties on the Branch field (in the main report), I've added a "Go To Report" action. The drill report is referenced here. I've added 3 parameters to the "action". The values are the (1) Team parameter, (2) the Type parameter, and (3) the Branch field. I have made the default value for the first 2 parameters the parameter value.
I've run the main report and the summary report is displayed like it should with each Branch underlined. When I click on the hyperlink for a branch, the second report opens up with the (1) Team and (2) Type parameters displayed with the selections the user made from the main report.
However, I'm getting the following error message:
- The report parameter 'Team’ has a DefaultValue or a ValidValue that depends on the report parameter “Team”. Forward dependencies are not valid. rsInvalidReportParameterDependency)
Is this because I made the default values the parameter values?
I removed the default values and tried again and this time I got the following error message:
- An attempt was made to set a report parameter 'SVP Team' that is not defined in this report. (rsUnknownReportParameter)