Hi,
We moved all of our SSRS subscriptions to shared schedules, in order to better manage our subscriptions process. However, I can't figure out how to re-run an individual failed subscription without re-running every report that is sharing the same schedule.
For example, let's say I have reports A, B, and C that share schedule Z. After the schedule is hit, reports B and C run successfully, but there was a problem with report A. I want to re-run report A without re-running reports B and C.
Is this possible with shared schedules?
Thanks,
Chris